Installation Information for the Short Kit

Installation Process:

Step 1: Install the Cast-In Bottom Puddle Flange before pouring the concrete.

Step 2: Apply the bottom layer of the waterproofing membrane.

Step 3: Mark, measure, and allow for the base and cap "grate adaptor." Then, cut the top puddle flange to the required bedding height.

Step 4: Insert the Top Puddle Flange dropper into the Bottom Puddle Flange Base Kit.

Step 5: Pack the area around and between the two puddle flanges with a structural bedding tile mix.

Step 6: The flush-fitting puddle flange with the base cap can be raised to meet the tile height.

Step 7: Install the top layer of the waterproofing membrane as required, covering the Top Puddle Flange.